Controller and PLC logic review
Check how the external controller responds to the prepared HVAC machine. Review the sequence of operations, interfaces and observed actions, then turn identified gaps into an implementable change proposal.
Request a service proposal- A review of the tested control sequences, interfaces and uncovered cases.
- Reproducible scenarios and evidence showing observed deviations.
- A proposed controller/PLC integration approach: affected points, logic, parameters and dependencies.
- A regression and acceptance plan for implementation by the agreed controls team.
How the work proceeds
- Define the question
- Agree the control functions, available access and evidence needed.
- Exercise the logic
- Run relevant normal, transition, fault and recovery scenarios against the prepared machine.
- Propose and verify the change
- Document the intended modification and the tests required after implementation.
Scope and acceptance
- Review can be based on observed input/output behaviour; source-level conclusions require access to the relevant controller code.
- Controller programming, firmware changes and on-site commissioning are included only when expressly agreed.
- The report identifies tested versions and scenarios so its conclusions remain traceable.
A preview predicts behaviour within the prepared model. Customer evidence records the actual test, its conditions and its measured outcomes against criteria agreed before the run.
Engineering services, training and separately purchased assistance are contracted, invoiced and paid directly to Systèmes ModbusSim Inc., outside Paddle. The company handles these invoices, applicable taxes, delivery, cancellations and refunds under the accepted service quotation.
Controller logic review and optimization
Custom quotation
Agree the controller scope, available source or logs, proposed changes and verification responsibilities.
Planning ranges, not fixed-price promises. Based on an indicative US$200/hour rate and the estimated scope below. Data quality, complexity and acceptance criteria determine the written quotation; software licences, travel and physical-machine validation are separate unless expressly included.
Optional engineering servicesDirect company invoice. Scope, currency, price, taxes, payment schedule, delivery and cancellation terms are agreed in the quotation; valid for 30 days unless stated otherwise.
Currency and quotationsTell us about the machine and the test.
Describe the controller, operating concern, available data and intended deliverable. We will clarify the scope before preparing a quotation.
info@modbussim.com